School House at Hopewell Cross Roads, Md. April - May
- Title
- School House at Hopewell Cross Roads, Md. April - May
- Date
- 04-01-1868
- Creator
- Rev. John Kimball
- Description
- Lists the materials needed to build the Hopewell Crossroads school, the costs of materials, the dates the materials were purchased, and the total cost ($460.98)
- Source
- Smithsonian, National Museum of African American History and Culture
- Courtesy of the U. S. National Archives and Records Administration, FamilySearch International, and the Smithsonian National Museum of African American History and Culture.
- Transcript
-
P. 172
School House at Hopewell Cross Roads - Md.
1868 | | | Per bill of Davis & Pugh
April | 1 | For 2161 ft. Pine Lumber @ $35.00 per ft | 75 | 63
1868
Per bill of Davis & Pugh
April
1
For 2161 ft. Pine Lumber @ $35.00 per ft
75
63
“ 108 “ “ “ $45.00 “ “
4
86
“ 900 “ Siding “$28.00 “ “
25
20
“ 800 “ “ (clear) ‘ $40.00 “ “
32
00
“ 1,000 “ Hemlock
22
00
“ 8,000 Shingles “ $9.50 “ “
76
00
“ 1384 “ Scantling “$22.00 “ “
30
44
“ 4500 Laths “$4.00 “ “
18
00
“ 1 Door Frame Frame (for transom)
5
00
“ 1 Transom (glazed)
1
25
“ 1 Door
7
00
“ 8 Window Frames @$3.85
30
80
“ 8 Windows of Sash (glazed) “ $4.80
38
40
“ 880 ft. Flooring @$35.00 per m
30
80
“ 2 Kege nails “$7.00
14
00
“ 1 “ “
8
00
$419
38
Per bill of Davis & Pugh
April
20
For 1 Rim Lock & Knot
1
00
“ 1 Pr. Hinges
25
“ 1 _ oz?. Screws
10
May
2
“ 30 B____ Line @.75
22
50
“ 7 “ Hair @.65
4
55
“ 600 Bricks @$17.00 per m
10
20
“ 50 ft. Pine Lumber (dressed ___) @.06
3
00
$41
60
460